EEGA logo

Consulting Services on Natural Gas Sector of Russia

 Home Site Map 


Altay Project: Gas Pipeline from West Siberia to China


Length - 2622 km; pipe diameter - 1420 mm (56-in); number of compressor stations - 11; number of GPA-16 aggregates - 64 x 16 MW.

Source: Gazprom briefing, June 14, 2007 - http://www.gazprom.ru/documents/report_Ananenkov.pdf


Last modified: 06/09/07                    ŠEast European Gas Analysis 2007                   Tel: +1 215 754 4653                         Email: info@eegas.com
Reproduction or use of materials is allowed only with reference to East European Gas Analysis or this site